Skip to content
Solar Farm Facts
- 563 kilowatt (kW) Solar photovoltaic (PV) System
- Online: October 2018
- Footprint: 3 acres Golden Valley Electric Association (GVEA) Solar Graphic
- Contractor: ABS Alaskan, Inc.
- Panel manufacturer: CSUN
- Each of the 1,760 panels will generate up to 320 watts.
- Contractor: ABS Alaskan, Inc.
- Cost: $850,000 after a $225,000 grant supplied from United States Department of Agriculture (USDA) Rural Energy for America Program (REAP)
- Annual energy production is estimated to equal the annual energy used in 71 homes (using an average of 660 kilowatt-hours (kWh) per month)
- Located on GVEA property next to BESS and Wilson Substation – Visible from VanHorn Road
Spinach-platform-admin@scienceisfune.com
Gambling-software-contact@finecocoaprod.com
sbotop-Sports-admin@grassvalleypm.com
365-Sports-support@hotelbafelresidency.com
新葡新京
Betting-company-hr@chalakseir.com
Macau-Galaxy-Entertainment-City-contactus@marcosperezdesign.com
Gambling-platform-customerservice@ub8str.com
沙巴体育app
虎跃快客时刻表
毕业论文网
QQ绿色网域
开封欣欣旅游网
《天下3》客服专区
退伍老兵赚客网
07073新游频道
巴中传媒网
天象互动《花千骨》
万年历查询